NPRI reporting and MSAPR testing, in one place

AtmosIQ gives oil and gas operators one set of air-emissions numbers for every site: from fuel and equipment data to a validated NPRI report, with every required engine and boiler test tracked on time.

Demo gas plant · NPRI 2026Demo data
1. SetupDone
2. SourcesDone
3. ReleasesIn progress
4. Review and submitNot started
3
MSAPR tests overdue
7
Due in the next 30 days

From site data to a submitted report

NPRI report, in four steps

1

Set up the site

Confirm the facility's profile, then answer the reporting triggers once. AtmosIQ shows only the parts of the report that apply to that site.

2

Bring in your sources

Stationary combustion, flares, incinerators, road segments, process fugitives, substances, waste and tailings, entered or imported in one place.

3

Review your releases

AtmosIQ calculates releases to air, water and land, and shows which substances are reportable and how far each is from its threshold.

4

Validate and submit

Fix what's flagged, validate for SWIM, then download the report for ECCC.

MSAPR testing, on one list

Action required · all sitesDemo data
Compressor engineENG-101Overdue 12 days
Glycol reboilerBLR-204Overdue 3 days
Line heaterHTR-310Due in 9 days
Generator engineENG-118Due in 21 days
  • See what's due: every overdue and upcoming test across your sites, with the unit, its tag and the last test date.
  • Plan ahead: a calendar of scheduled tests that you can export to your own calendar.
  • Log results: record a test as it's done, or upload past tests in bulk, and the next due date updates itself.

Built for compliance leads who answer for the numbers

Calculations you can defend

Combustion emissions follow the CEPEI natural gas combustion calculator's factors and order, so your numbers match the method your auditors know.

Catch problems before ECCC does

SWIM validation flags missing fields before you submit, so the report goes in clean.

Every site, one picker

Switch between facilities by name or Petrinex ID, without leaving the page you're on.

Trends year over year

See how each substance moves across years and compare any two years side by side.

Answers in plain language

Ask the AtmosIQ Assistant what's overdue, why a substance is reportable or what's left before you can submit.

Roles and a full change log

Assign who owns each site's NPRI and MSAPR work, and see who changed what, and when.

For the people who sign off on air emissions

Environmental and regulatory leads

One place to prepare, check and submit NPRI for every facility you report, without rebuilding the spreadsheet each spring.

Field and operations teams

See which engines and boilers are due for MSAPR testing, book ahead and log results the day the test is done.

Consultants who report for several operators

Switch between clients and sites quickly, with each operator's data and access kept separate.

Frequently asked questions

Does AtmosIQ submit to ECCC for me?

No. AtmosIQ runs the same validation checks as SWIM and produces the report file. You upload it to SWIM yourself, so your company stays the one submitting.

How are combustion emissions calculated?

AtmosIQ uses the factors and calculation order from the CEPEI natural gas combustion calculator, applied to your fuel use and equipment data.

Which facilities does it support?

Upstream and midstream oil and gas sites in Canada, such as gas plants, compressor stations and batteries. You can set up as many sites as you report, and find them by name or Petrinex ID.

What does it track for MSAPR?

Every engine, boiler and heater that needs NOx testing, when each test is due and what the last result was. You can upload past tests in bulk to get started.

Who can see our data?

Only the people you invite. You set each person's role, and the change log records who changed what, and when.

EnviroByte

Get ready for June 1 before spring gets busy

See how AtmosIQ takes one of your sites from fuel data to a validated NPRI report.